Customization: | Available |
---|---|
Type: | High Frequency Brazing Machine |
Welding Speed: | 3-4s/PCS |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
220V welding frame rack machine for circular diamond saw blade on sell
220V welding frame rack machine for circular diamond saw blade on sell is a special tool designed for efficient and accurate welding of saw blades. Its robust construction provides stability during welding and ensures accurate alignment. The frame increases productivity by facilitating seamless blade welding, contributing to the overall quality and durability of the blades.
Main Features:
1. Double cylinder clamping ensures the welding accuracy of the cutter head.
2. The dual cylinders holding would ensure the welding precision even the saw blade is distorted; to make sure the segments stay right in the mid-line of the saw blade.
3. The segments clamping device adopts mechanical geometric alignment to ensure symmetry and accuracy.
4. Easy to operate, save time and labor, general workers can be operated after simple training.
Model | FL-HJ-1200 |
Application range | φ300mm-φ1200mm |
N.W. | 165kg |
Verticality | ≤±0.03mm |
Face Runout | ≤±0.03mm |
Size | 850mm*750mm*1500mm |
Cooling water flow | 2-5L/min |
Cooling water pressure | ≥0.2Mpa |
Air source pressure | 0.5-0.8Mpa |
1. Based on the size of the conventional saw blade, determine the height of the machine base and install it according to the installation diagram
2. Correct the verticality of the welding frame and the center of gravity of the foundation, and fix the frame horizontally.
3. Connect the cooling water.
4. Place the welding machine properly, connect the induction coils, adjust the welding position, and connect the inlet and outlet pipes of the welding machine.
5. Connect the air intake source and adjust the pressure of each pressure regulating valve.
6. Connect the power supply, welding machine power supply, automatic temperature control timing power supply, and water pump power supply.
7. Adjust the welding positions at various locations: parallel position between the copper water clip and the saw blade substrate, opening position of the copper water clip, position of the quick cooling nozzle, welding position of the induction ring, welding height position of the copper clip head, and position of the saw blade substrate.
8. To repair the ceramic chuck, first remove the lower limit body, clamp the repair block between the two copper water clamps, operate the down pressure handle, and move the ceramic chuck up and down to ensure parallelism with the two copper water clamp surfaces.
Within 24 hours.
We are a manufacturer.
Yes, we will test all the products you purchase before shipping to ensure they work properly.
Our factory has over 28 years experience in making diamond tool equipment, and we have rich experience in the production and design of these machines.
All the components of the machinery are produced by ourselves and then assembled into finished products, so the quality of the products is guaranteed.
The warranty period for the machine is one year.